Unit -16: Verify compliance of low voltage systems Quiz 2
  Student data   Test instructions   Page direction

Q1           Score:  1
 a. 0.25M ohms
 b. 2.0M ohms
 c. 1.0M ohms
 d. 0.5M ohms
Q2           Score:  1
 100A
 30A
 15A
 60A
Q3           Score:  1
 a. Large loads such as electric motors being switched on
 b. The run of circuit conductors is long and there is high resistance in the conductors
 c. Sudden change in loads
 d. The loss of power
Q4           Score:  1
 a. Protective devices like fuses and breakers would not be activated
 b. Over voltage
 c. Over current
 d. Under voltage
Q5           Score:  1
 a.Connects the main earthing to the earth electrode
 b.Connects any portion of the earthing system to the portion of the electrical installation
 c.Connects to the general mass of the earth
 d.Links the earth with the electrode
Q6           Score:  1
 a. Earthing
 b. Bonding
 c. Basic protection
 d. Fault protection
Q7           Score:  1
 a. Power transformer
 b. Distribution transformer
 c. Welding machine transformer
 d.Three phase transformer
Q8           Score:  1
 a. Protection against over voltage
 b. Protection against under voltage
 c. Protection against over current
 d. Stabilize the neutral voltage to zero at the start of the installation and provide the lowest to fault currents possible impedance to
Q9           Score:  1
 a.Wattmeter and phase sequence indicator
 b.Phase sequence indicator and static type phase sequence indicator
 c.Static type phase sequence indicator and ohmmeter
 d.Wattmeter and static type phase indicator.
Q10           Score:  1
 a. Power transformer
 b. Distribution transformer
 c. Welding machine transformer
 d. Three phase transformer


   



Questions you haven't answered yet:


Are you sure you want to end this test and send your answers?

  


All copy rights reserved © arab-exams.com
  2014-2023